ARTICLE VI
SECTION 25.34
ADMINISTRATION AND ENFORCEMENT
A.
ENFORCEMENT:
1.
Zoning
Officer: The
Commission shall appoint a Zoning Officer and may appoint one or more Deputy
Zoning Officers. The Commission also
shall have the responsibility and authority to enforce the provisions of these
Regulations.
2.
Enforcement
a.)
These
regulations shall be enforced by the Zoning Officer and/or designatee of the
Commission, who shall be empowered to cause any building, structure, place or
premises to be inspected and examined and to order, in writing, the remedying
of any conditions to be found to exist therein or threat in violation of any
provision of these Regulations, or any permit or approval issued
hereunder. The Zoning Officer and/or
designee of the Commission shall have such powers and authority as enumerated
in Chapter 124 of the Connecticut General Statutes as amended. The owner or agent of a building, structure,
or property where such violation shall have been committed or shall exist, or
the lessee or tenant of an entire building or an entire lot where such
violation shall have been committed or shall exist, or the agent, architect,
builder, contractor or any other person who shall commit, take part or assist
in such violation or who shall maintain any building or premises in which such
violations exist shall be guilty of a misdemeanor punishable as provided in
Chapter 124 of the Connecticut General Statutes, as amended.
B.
ZONING
PERMITS
1.
Application
for Zoning Permits
a.)
Prior
to the construction, reconstruction, change of use, enlargement, extension,
moving or structural alteration of any building, and prior to any occupancy or
use or change in use of any land, building or other structure or part thereof,
an application for a Zoning Permit shall be submitted to the Zoning
Officer. If the Zoning Officer
determines that the proposed building or other structure or use is in
compliance with these Regulations, he/she shall issue a Zoning Permit. However, no such permit shall be issued for
the construction, reconstruction, change of use, enlargement, extension, moving
or structural alteration to any building requiring approval of the Commission,
Zoning Board of Appeals, and/or the Conservation Inland Wetlands Commission
until such approvals have been granted by said Commissions and Boards.
b.)
Application
for a Zoning Permit or a Sign Permit shall be applied for and submitted to the
Zoning Officer prior to submittal of a building permit application.
c.)
Application
for a Zoning Permit shall be accompanied by the following as applicable to the
particular proposal:
1.
A
plot plan and building plan as specified in Section 25-34 C
2.
A
site plan as required in Section 25.17
3.
Building
and floor plans as specified in Section 25.31
4.
A
copy of the recorded variance, Special Exception Certificate and/or Wetlands
Permit;
5.
Verification
of local health authority approval;
6.
Such
additional information that the Zoning Officer deems necessary to determine
compliance with the provisions of these Regulations.
C. PLOT
PLAN
1. A plot plan shall be submitted with an
application for a zoning permit for any proposed building, structures and/or
improvements. The plot plan shall be
submitted in duplicate, shall be drawn to a scale not to exceed one inch equals
twenty feet (1”=20’), shall be based on the City of Derby Assessor’s Maps and
shall show all of the following information both existing and proposed, where
applicable:
a) Name
of applicant and property owner;
b) The
area of the lot, and the dimensions of all lot lines and proposed and existing
grades;
c) Street
address and assessor’s map and lot numbers;
d) North
arrow and graphic scale;
e) The
height, dimension, use, floor area, ground coverage and location of all
buildings and other structures;
f) The
locations, area and dimension of off street parking and loading spaces,
driveways, easements, and rights-of-way;
g) Dimensions
of all setback lines observed by buildings and structures;
h) The
location of any on-site sewage disposal system, water supply well; and building
lateral
i)
Signs and other facilities and improvements that
are subject to the provisions of these regulations;
j)
Any wetlands, watercourses and special flood
hazard areas;
k) When
located in a Flood Plain area, include existing and proposed site grades,
contours and elevations, base flood elevation data, top of foundation
elevation, finished floor elevation and any proposed watercourse relocation;
l)
Soil erosion and sedimentation control plan;
m) Such
additional information as may be necessary to determine compliance with the
provisions of these regulations.
A certified A-2 plot
plan containing all information required in a-k above shall be submitted with
an application for a Zoning Permit for any new dwelling, for any new detached
structures 850 square feet in area or larger, and for any addition to an
existing detached structure which will result in an area of 850 square feet or
larger if the proposed location of the structure is within five (5) feet of
required front, side and/or rear yard setbacks.
The Zoning Officer may
waive the A-2 plot plan requirements to allow a partial A-2 survey for critical
property lines only in cases where an A-2 survey of the entire property is
deemed not practical and/or is not needed to determine conformity with these
regulations.
In cases where an A-2
survey exists, the applicant may use such A-2 survey as a basis for an
application without the assistance of a licensed land surveyor, engineer or
architect.
4. Foundation
Verification
The applicant shall
submit a certified A-2 “as-built” plot plan to the Zoning Officer within 14
days after completion of foundation footings, columns, piers or walls for
verification of setback lines for any new dwelling, for any new detached
structures 850 square feet in area or larger, and for any addition to an
existing detached structure which will result in an area of 850 square feet or
larger, if the proposed location of the structure is within five (5) feet of
required front, side and/or rear yard setbacks.
D. CERTIFICATE
OF ZONING COMPLIANCE:
1.
Prior
to the issuance of any certificate of occupancy by the Building Official, an
application for a Certificate of Zoning Compliance shall be submitted to the
Zoning Officer. If the Zoning Officer
determines the building or other structure, use and/or site work is in
compliance with an approved site plan, special exception or special permit and
with these Regulations, he shall issue a Certificate of Zoning Compliance. Failure to comply with all conditions of an
approved plan or with these Regulations will cause a delay in the issuance of a
Certificate of Zoning Compliance.