Derby Recreation StudyNew - Master Plan for Outdoor Recreation Facilities The Master Plan for Outdoor Recreation Facilities has been completed by the Committee. You may click on the links above to read the report and view the cost estimates. The information below was developed along the way and is the background information used in developing the final report. This plan has been changed in conjunction with the School Building Committee's plans for a new high school. The new plan is quite different than this one and saves $1,000,000 in costs because of state reimbursements available for the school building project. However, the underlying study of existing conditions and needs presented here is still valid. Memorandum on Existing Conditions and Concepts for Field ImprovementsThe following report was prepared as a preliminary step in the development of the Master Plan for recreation facilities within the City of Derby. This report is presented on the Derby website in order to keep the public fully informed and to solicit input for the process. Previously available on line: Section 1 Preliminary Report on Outdoor Athletic Facilities Section 2 Preliminary Report on Indoor Athletic Facilities Section 3 Report on Conceptual Alternatives (Slow downloads!) Appendix Conceptual Budget Estimates Engineer's Graphical Renditions of Concepts:
Prepared by: |
||||||||||||
Back to Derby Home Page |